top of page
center2_1.jpg
shadow.png

DECORATION OUTFITTING/FURNITURE,
TIME & COST SAVINGS+ACCELERATE THE
RETURN OF INVESTMENT.

"RGB" E-SPORTS ARENA

The benefits: 
-Time and cost save
-Accelerate your return on investment
-A reasonable manufacturing price with a different design scheme selection.  
-Door-to-door delivery
-ETL(U.L equivalent) approval
-Provide games, operation systems, and networking services optionally.

area1.jpg
rooms.jpg

A PIONEER IN THE INDUSTRY

We have created over 1000's Esports arenas/centers worldwide across China, North & Latin America, South East Asia, E.U, and the MEA region since 2016.

area c.jpg
940.jpg

E-SPORTS CENTER SOLUTION

- 3D designing for site.

- Industry-leading environment design on decor, furniture, gaming devices, and all networking setup.

- E-sport center management software training.

- Installation and construction on-site consulting.

- POS setup and operations guidance.

- Events, tournaments, and store marketing.

An "RGB" Esports Arena set-up Scenario

STEP 1:
IDENTIFYING LOCATION & BUDGET

Characteristic of a location idea
- Young population.
- Parking lot.
- Adjacent to shopping malls, sports facilities, or colleges.
- Approach by public transportation.


Start-up standard:
- Starting with 25 seats(+) with 1500 sq feet(+)

STEP 4:
ACTION STAGE

- Provide the Return Of Investment plan.
- Provide an optionally need for P.C, Networking, operation System idea.
- 3D design, video work. (request a refundable upfront fee)

STEP 2:
LOCATION EVALUATION

- Shortlist 2-3 of the selective locations.
- Submit the floorplan for the consultation.

STEP 5:
PRODUCTION AND DELIVERY STAGE

- Return and confirm the sales proposal.
- Receive the down payment.
- Return a construction plan.
- Process the production and P.C equipment pre-order.
- Receive the balance.
- Ship the outfitting and equipment to the designated address by our Door-to-Door service.

STEP 3:
2D LAYOUT

- Proceed with the 2D design plan.
- Roughly cost idea with the different design scheme selection.

STEP 6:
INSTALLATION STAGE

- Received the goods onsite.
- Start the installation and optionally with PC system and networking etc.
- Test and run-up training.

Grand Opening

bottom of page